Blogs

Permits
Don Healy

The Hidden Cost of Hydric Soils: A Builder’s Guide to Oregon’s Wetland Regulations

Hydric soils indicate wetland conditions that trigger Oregon and Washington development restrictions under state and federal law. Wetland delineations cost $2,000 to $8,000. Properties with confirmed wetlands face setback requirements of 25 to 100 feet, reducing buildable area. Development in regulated wetlands requires permits from the Army Corps of Engineers and state environmental agencies.

Read More »
House + cracked driveway: Modern house with cracked driveway and expansive clay soil showing foundational risk.
Planning
Don Healy

Why Expansive Soils Matter When Buying Land?

Expansive soils contain clay minerals — particularly montmorillonite — that expand significantly when wet and contract when dry. This volume change exerts uplift pressure on foundations and slabs, causing cracking and structural damage over time. Pacific Northwest soils with high clay content require geotechnical evaluation before purchase or foundation design.

Read More »
Grading
Don Healy

What Is a Perk Test? A Must-Know for Homebuyers & Developers

A percolation test measures soil drainage rates to determine whether land can support a septic system. Soil absorbing water at 5 to 30 minutes per inch meets standard septic requirements. Tests cost $300 to $1,500 for standard assessments. Failed tests may require engineered systems costing $15,000 to $40,000 or more, or connection to municipal sewer if available.

Read More »